Confirm the failure
Rule out fixable tank, pipe, distribution and pump problems before designing a new field.
Protect the usable area
Wells, boundaries, washes, slopes, pools and paving can constrain primary and reserve disposal areas.
Choose the right design
Site testing determines whether a conventional trench or chamber design is suitable, or whether alternative treatment is needed.
Obtain the authorization
Pima County reviews the design and issues Construction Authorization before replacement begins. The tank may also need evaluation.
Finish before use
Inspections, testing and final documents lead to Discharge Authorization. Weather, site access and corrections can affect the schedule.